Solution

Fully Automatic Drinking Mineral Water Filling Machine Water Production Line Fully Automatic Drinking Mineral Water Filling Machine Water Production Line

Quantity:
Share this:

Product Description

Water Filling Line Production Plant is one of advanced models which is our company combines international advanced self-filling process and technology developed specifically for mineral water, pure water and other non-gas beverage filling installation.

 


Technical Parameter

Main technical parameters:


ModelRFC-W 14-12-5RFC-W16-16-5RFC-W24-24-8RFC-W32-32-8RFC-W40-40-10RFC-W50-50-15RFC-W60-60-15RFC-W72-72-18
Capacity 3,000-5,000bph5,000-8,000bph10,000-12,000bph15,000bph18,000bph22,000-24,000bph28000-30,000bph36,000bph
Suitable bottleφ=50-110mm H=160 -310mm     200-2500ml PET bottles 
Power 2.42kw3.12kw 3.92kw3.92kw5.87kw7.87kw11.37kw11.37kw
Dimension 2360x1770x27002760x2060x27002800x2230x27003550x2650x27004700x3320x27005900x4150x27005770x5290x27006540x4900x2700
Weight2500kg3500kg3800kg4200kg5000kg8500kg11000kg13000kg

Bottle Water Filling Machine


A) Washing part of Bottled Water Filling Machine:

l All 304 stainless steel rinser heads, water spray style inject design, save water consumption & more clean

l 304 Stainless steel Gripper with plastic pad, ensure minimal bottle crash during washing

l 304 stainless steel washing pump 

QQ图片20171017143755.jpg


B) Filling Part of  Bottled Mineral water filling machines :

l High precision filling nozzle, PLC variable signal control, ensure high filling precision & filling smoothly & steadily,

l Filling volume adjustable in fine rank, same liquid level after filling

l All 304 stainless steel contact parts & liquid tank, fine polish, no death corner, easy to clean

l 304 stainless steel filling pump

l no bottle no filling

QQ图片20171017143942.jpg

C) Capping part of Bottled Mineral water filling machine:

l Place & capping system, electromagnetic capping heads, with burden discharge function, make sure minimum bottle crash during capping

l All 304stainless steel construction

l No bottle no capping,

l Automatic stop when lack of bottle

QQ图片20171017143812.jpg



Features

Place & capping system. Automatic caps arranging, feeding.

Electromagnetic capping heads, with burden discharge function,

All 304stainless steel construction

No bottle no caps delivery.

Automatic stop when lack of bottle

Workshop Production

FAQ

Q1: Are you a trading company or a manufacturer?

A1: We have our own factory for many years,can give u best service.

Q2: What's your guarantee if we buy your machines?

A2: We offer you high quality machines with 1 year guarantee and free spare parts for 1 year. Meanwhile our engineers have rich experience and have gone to more than 50 countries for installation and commissioning.

Q3: When can I get my machine after I paid?

A3: We will deliver the machines on time as the date we agreed both side.

Q4: How can I install my machine when it arrives?

A4: Our engineer will go to your side as soon as you get your machines ready for testing and teaching your technicians how to run the machines.

Q5: What's the delivery time?

A5: 30-45 days after the T/T deposit or L/C.

Q6: Do you provide customized service?

A6: We can design the machines according to your requirements (material, power, filling type, container and etc), at the same time we will give you professional suggestion by many years industrial experience.

×

Contact Us

captcha